Skip to main content

COLLECTION AND TREATMENT OF LEACHATE FROM SOLID WASTE DUMPS

ATTENTION:
BEFORE YOU READ THE CHAPTER ONE OF THE PROJECT TOPIC BELOW, PLEASE READ THE INFORMATION BELOW.THANK YOU!

INFORMATION:
YOU CAN GET THE COMPLETE PROJECT OF THE TOPIC BELOW. THE FULL PROJECT COSTS N5,000 ONLY. THE FULL INFORMATION ON HOW TO PAY AND GET THE COMPLETE PROJECT IS AT THE BOTTOM OF THIS PAGE. OR YOU CAN CALL: 08068231953, 08168759420




COLLECTION AND TREATMENT OF LEACHATE FROM SOLID WASTE DUMPS


Abstract
Leachate generation is a major problem for municipal solid waste (MSW) landfills and causes significant threat to surface water and groundwater. Leachate can be defined as a liquid that passes through alandfill and has extracted dissolved and suspended matter from it. Leachate results from precipitation entering the landfill from moisture that exists in the waste when it is composed. This paper presents the results of the analyses of leachate treatment from the solid waste landfill located in Borg El Arab landfill in Alexandria using an aerobic treatment process which was applied using the mean of coagulation flocculation theory by using coagulant and accelerator substances for accelerating and improving coagulation and flocculation performance.

The main goal of this study is to utilize a natural low cost material “as an accelerator additive to enhance the chemical treatment process using Alum coagulant and the accelerator substances were Perlite and Bentonite. The performance of the chemical treatment was enhanced using the accelerator substances with 90 mg/l Alum as a constant dose. Perlite gave better performance than the Bentonite effluent. The removal ratio for conductivity, turbidity, BOD and COD for Perlite was 86.7%, 87.4%, 89.9% and 92.8% respectively, and for Bentonite was 83.5%, 85.0%, 86.5% and 85.0% respectively at the same concentration of 40 mg/l for each.
TABLE OF CONTENT:

CHAPTER ONE
INTRODUCTION
1.1     Background of the Study
1.2     Statement of the Research Problem
1.3     Objectives of the Study
1.4     Significance of the Study
1.5     Research Questions
1.6     Research Hypothesis
1.7     Conceptual and Operational Definition
1.8     Assumptions
1.9     Limitations of the Study

CHAPTER TWO
LITERATURE REVIEW
2.1     Sources of Literature
2.2     The Review
2.3     Summary of Literature Review

CHAPTER THREE
RESEARCH METHODOLOGY
3.1     Research Method
3.2     Research Design
3.3     Research Sample
3.4     Measuring Instrument
3.5     Data Collection
3.6     Data Analysis
3.7     Expected Result
CHAPTER FOUR
DATA ANALYSIS AND RESULTS
4.1     Data Analysis
4.2     Results
4.3     Discussion
CHAPTER FIVE
SUMMARY AND RECOMMENDATIONS
5.1     Summary
5.2     Recommendations for Further Study
References


HOW TO GET THE FULL PROJECT WORK

PLEASE, print the following instructions and information if you will like to order/buy our complete written material(s).

HOW TO RECEIVE PROJECT MATERIAL(S)
After paying the appropriate amount (#5,000) into our bank Account below, send the following information to
08068231953 or 08168759420

(1)    Your project topics
(2)     Email Address
(3)     Payment Name
(4)    Teller Number
We will send your material(s) after we receive bank alert

BANK ACCOUNTS
Account Name: AMUTAH DANIEL CHUKWUDI
Account Number: 0046579864
Bank: GTBank.

OR
Account Name: AMUTAH DANIEL CHUKWUDI
Account Number: 2023350498
Bank: UBA.



FOR MORE INFORMATION, CALL:
08068231953 or 08168759420



AFFILIATE LINKS:
myeasyproject.com.ng
easyprojectmaterials.com
easyprojectmaterials.net.ng
easyprojectsmaterials.net.ng
easyprojectsmaterial.net.ng
easyprojectmaterial.net.ng
projectmaterials.com.ng
googleprojectsng.blogspot.com
myprojectsng.blogspot.com.ng
https://projectmaterialsng.blogspot.com.ng/

Comments

Popular posts from this blog

PUBLIC RELATIONS AS A TOOL FOR INDUSTRIAL HARMONY. (A CASE STUDY OF CONSTRUCTION INDUSTRY)

  ATTENTION: BEFORE YOU READ THE ABSTRACT OR CHAPTER ONE OF THE PROJECT TOPIC BELOW, PLEASE READ THE INFORMATION BELOW.THANK YOU!   INFORMATION: YOU CAN GET THE COMPLETE PROJECT OF THE TOPIC BELOW. THE FULL PROJECT COSTS N5,000 ONLY. THE FULL INFORMATION ON HOW TO PAY AND GET THE COMPLETE PROJECT IS AT THE BOTTOM OF THIS PAGE. OR YOU CAN CALL: 08068231953, 08168759420       PUBLIC RELATIONS AS A TOOL FOR INDUSTRIAL HARMONY. (A CASE STUDY OF CONSTRUCTION INDUSTRY) ABSTRACT There has been a meaningful contribution by researchers on this subject; public Relations. So this project developed after a series of consultation and research. In order to put to rest the about is the mind of many as to whether public relation is necessary in an industry or organization, I strongly believe that the industry is the means through which public relatio...

PUBLIC RELATION A TOOL FOR CONFLICT RESOLUTION (A CASE STUDY OF PHCN)

  ATTENTION: BEFORE YOU READ THE ABSTRACT OR CHAPTER ONE OF THE PROJECT TOPIC BELOW, PLEASE READ THE INFORMATION BELOW.THANK YOU!   INFORMATION: YOU CAN GET THE COMPLETE PROJECT OF THE TOPIC BELOW. THE FULL PROJECT COSTS N5,000 ONLY. THE FULL INFORMATION ON HOW TO PAY AND GET THE COMPLETE PROJECT IS AT THE BOTTOM OF THIS PAGE. OR YOU CAN CALL: 08068231953, 08168759420       PUBLIC RELATION A TOOL FOR CONFLICT RESOLUTION (A CASE STUDY OF PHCN) ABSTRACT A public relations is the acts of employing effective communication to build sustain and defend organization’s reputation among both its internal and external publics. Remarkably which any organizations public image receives a high rating bases on the foregoing attributes it translates into increased public confidence patronage good will higher profit growth peaceful and stable environme...

ELECTRICITY TARIFF INCREASE BY FEDERAL GOVERNMENT OF NIGERIA IS EVIL

ELECTRICITY TARIFF INCREASE BY FEDERAL GOVERNMENT OF NIGERIA IS EVIL Nigeria federal governments over the years have been very irresponsible when it comes to electricity, there have been a continuous accumulation of gross mismanagement and misappropriation of funds which should have been used to develop our electrical power generation capacity. The poor levels of power supply in Nigeria have affected the growth and development rate of the Nigeria economy. It is therefore a move pf gross insensitivity for the federal government of Nigeria to plan to further increase electricity tariffs even in the face of poor management and administration in Nigeria. ARTICLE SPONSOR: http://easyprojectmaterials.com.ng/